AFP Probes Report Tied to Perth Cable Issues
We independently review everything we recommend. When you buy through our links, we may earn a commission which is paid directly to our Australia-based writers, editors, and support staff. Thank you for your support!
Quick Overview
- AFP investigating possible criminal activity linked to undersea cable issues near Perth.
- Issues identified in Indigo West and Indigo Central cables belonging to SUBCO.
- Concerns raised that the incidents may stem from vessel operations or intentional harm.
- FibreSense, an advanced detection system, not implemented on impacted cables.
- AusInternet announces service disruptions; repairs are projected to be completed by August 26, 2026.
- Calls for investigation made by authorities due to possible recurrent issues in the protected area.
AFP Investigates Possible Cable Interference
The Australian Federal Police (AFP) is currently looking into a potential crime report after identifying faults in two undersea cables located in protection zones near Perth. These events have prompted worries about possible vessel activity or intentional sabotage.
SUBCO Alerts Authorities Regarding Cable Issues
Bevan Slattery, co-founder and co-CEO of SUBCO, which operates the Indigo cable networks, informed the AFP about the issues. The faults were found soon after SUBCO reported “shunt faults” in its Indigo West and Indigo Central systems, which connect Singapore and Sydney via Perth.
Understanding Shunt Faults
Shunt faults in undersea cables occur when the outer layer of insulation is compromised, allowing seawater to contact internal components. These faults are frequently the result of ship anchors and fishing activities. Slattery pointed out the unusual vessel movements in the vicinity but did not assert that damage was intentional.
Inadequate FibreSense Technology Contributes to Ambiguity
Slattery pointed out that if the cables had been equipped with FibreSense, an advanced fault detection system, the cause of the problems could have been identified immediately. Regrettably, Indigo West and Central lack this technology, making it difficult to ascertain the root cause until repairs are conducted.
AFP’s Position on the Ongoing Investigation
The AFP has confirmed receipt of the criminal report but has not yet declared whether an active investigation is underway. They are currently assessing the situation and will share updates as necessary.
Effects on Local Internet Services
AusInternet, a local internet service provider utilizing the Indigo West cable, has faced outages since the identification of the faults. They have redirected traffic to reduce interruptions and expect repairs to be completed by August 26, 2026, depending on logistical and weather factors.
Conclusion
The Australian Federal Police’s investigation into possible criminal activities associated with undersea cable faults near Perth highlights the importance of maintaining secure infrastructure. Although the exact cause remains uncertain, advanced detection systems like FibreSense could be crucial for preventing future occurrences.
Reader questions
Frequently asked questions
Fast answers to the questions readers ask most about AFP Probes Report Tied to Perth Cable Issues.
What initiated the AFP's investigation into the cables?
The inquiry was triggered by SUBCO’s notification regarding shunt faults in the Indigo cable systems, possibly connected to vessel operations or intentional harm.
What are shunt faults and their causes?
Shunt faults arise when the insulation surrounding undersea cables is compromised, typically due to anchors or fishing activities, which expose the inner parts to seawater.
Why is FibreSense important for fault detection?
FibreSense is a cutting-edge detection system capable of promptly pinpointing the causes of cable faults, which can help avoid additional damage or identify responsible parties.
In what way has AusInternet been impacted by the cable faults?
AusInternet has been encountering outages and rerouting traffic. They anticipate repairs to be completed by August 26, 2026, subject to logistical considerations and weather conditions.
What is the anticipated schedule for the repairs?
Repairs are expected to be finished by August 26, 2026, conditioned on access and logistical arrangements.
How will the AFP continue with the investigation?
The AFP is in the process of evaluating the situation and will issue more updates as more information becomes available.
